Project duration: 2025-01-01 - 2026-12-31

Temporary improvement of the airborne sound insulation of windows with external closures to maintain airborne sound insulation at night

In order to avoid a further increase in construction costs due to oversizing, the research project is investigating the extent to which external closures can contribute to compliance with airborne sound insulation at night.
keine Nennung auf Homepage THRO: Dr. Andreas Mayr, Prof. Dr.-Ing. Andreas Rabold
Labor für Schallmesstechnik Bauphysik Bautechnik Gesundheit Holzbau Schallschutz
Project duration: 2016-12-01 - 2020-05-31

NaWaRo insulation materials: More than just insulation - additional benefits of insulation materials made from renewable raw materials

The overarching, primary goal of this research network is to significantly increase the applicability of insulating materials made from renewable raw materials.
Project lead THRO: Prof. Dr.-Ing. Andreas Rabold
Labor für Schallmesstechnik Bauphysik Bautechnik Biomasse Holzbau Kreislaufwirtschaft Leichtbau Materialwissenschaft Nachhaltigkeit
Project duration: 2015-04-01 - 2017-03-31

Vibroacoustics in the planning process for timber constructions - modeling, numerical simulation, validation

The aim of the project is a planning process that closely links the numerical simulation and verification of vibroacoustic building properties to a comprehensive building information model (BIM).
Sub-project lead THRO: Prof. Dr. Ulrich Schanda
Labor für Schallmesstechnik Bauphysik Bautechnik BIM Building Information Modeling Digitale Transformation Finite-Elemente Methode Holzbau Körperschall

Simon Mecking


Technische Hochschule Rosenheim

Centre for Research, Development and Transfer
Hochschulstraße 1
83024 Rosenheim

T +49 (0) 8031 / 805 - 2582
simon.mecking[at]th-rosenheim.de

ORCID iD: 0009-0000-6835-9237