Responsive image


Project duration: 2024-01-01 - 2024-12-31

DBU_reversible wood-concrete composite ceilings

In this project, an attempt is being made to create a new type of bond between wood and concrete that requires few or no screw connections.

Bioökonomie und Holztechnologie Bauen, Planen und Energie Bioökonomie Holz-Beton Verbunddecken Holztechnik Holztechnologie


Project duration: 2023-12-01 - 2024-11-30

Development of a wooden traffic sign bridge TTS - Bridge

Within the scope of the project a traffic sign bridge made of wood is being constructed. Of particular of particular importance is the development of suitable monitoring and monitoring systems to record the load-bearing behavior. Furthermore, the the location of the traffic sign gantry, in the directly weathered outdoor area and with high high de-icing salt ingress, special attention must be paid to structural wood protection with the appropriate choice to pay particular attention to the wood species used.

Bioökonomie und Holztechnologie Bauen Bautechnik Planen und Energie


Prof. Dr. Johann Pravida


Technische Hochschule Rosenheim

Faculty of Wood Technology and Construction

T +49 (0) 8031 / 805 - 2387
johann.pravida[at]th-rosenheim.de