An Analysis of the Coordination Gap between Joint and Modular Learning for Job Shop Scheduling with Transportation Resources

mehr
Titel An Analysis of the Coordination Gap between Joint and Modular Learning for Job Shop Scheduling with Transportation Resources
Medien IEEE 22st International Conference on Automation Science and Engineering (CASE)
Verlag arXiv
Verfasser Moritz Link, Jonathan Hoss, Prof. Dr.-Ing. Noah Klarmann, B.Eng. Jonathan Hoß
Veröffentlichungsdatum 17.08.2026
Zitation Link, Moritz; Hoss, Jonathan; Klarmann, Noah; Hoß, Jonathan (2026): An Analysis of the Coordination Gap between Joint and Modular Learning for Job Shop Scheduling with Transportation Resources. IEEE 22st International Conference on Automation Science and Engineering (CASE). DOI: 10.48550/ARXIV.2604.24117