This project addresses the overarching question of how commercial properties can be gradually modernized and regulated to minimize the property’s energy consumption while maintaining the same quality of use, and to contribute to grid stability by shifting the timing of electricity consumption and –feed-in—to contribute to grid stability.

Project background

Buildings are complex systems that account for a large share of final energy consumption in Germany. In addition, buildings and the technology within them constitute infrastructure capable of generating, storing, and consuming large amounts of energy. Through the intelligent use of buildings, they can be operated more efficiently, and their energy flows can be shifted over time. This flexibility in energy flows can lead to significant cost reductions, help stabilize the power grids, and increase the penetration of renewable energy generators. 

Project objective

The goal is, on the one hand, to develop an optimization algorithm for the design and operation of the components. This algorithm will be tested in real-world conditions at an office building. The studies and simulations will also be used to derive recommendations for funding and/or technologies. 

Project procedure

Following an onboarding phase and a theoretical phase (2025), the optimization algorithm and modeling will be carried out in 2026. Preparation for the test operation, the test operation itself, and the simulation of various scenarios are scheduled for the next two years (2027 and 2028).

Innovation

For one thing, our project partners can apply the findings and models directly in their day-to-day operations. Building operators and companies can integrate some of these findings directly into their building automation systems. Collaboration with power grid operators is intended to help establish the control loop between the control center and the building and to regulate the building in accordance with grid requirements. This issue is currently a hot topic in energy technology, and many universities, institutes, and companies are working on it. 


Project lead


Project staff

M.Sc. Benedikt Mirwald
T +49 (0) 8031 / 805 - 2737
benedikt.mirwald[at]th-rosenheim.de

ORCID iD: 0009-0005-9618-8830

Project duration

2026-05-18 - 2026-12-31

Project partners

Duschl Ingenieure GmbH & Co. KG
Octopus Energy Germany GmbH

Project management agency

Friedrich-Alexander-Universität Erlangen-Nürnberg

Project funding

Bayerisches Staatsministerium für Wissenschaft und Kunst

Funding programme

Bayerisches Wissenschaftsforum